Marine & Coastal

Ireland: Tarmonbarry Marina Development

90-berth marina on the River Shannon. Works included 40,000 m³ marina excavation, 25,000 m³ inlet-channel excavation, temporary cofferdam, 2,000 m² reinforced-earth quay walls with concrete apron, 600 m access roads/footpaths and all services.

Contract Value: €3.10 m
Construction Period: 2018 – 2019

Tarmonbarry 1 Tarmonbarry 2 Tarmonbarry 3 Tarmonbarry 4
Marine & Coastal

Guyana: East Coast Bank Corridor – Slipway & Road

50 m mass-concrete slipway plus 150 m entrance road and car park, built inside a 5 m tidal zone behind a 7 m cofferdam bund. All materials barged from mainland.

Contract Value: $1.65 m
Construction Period: 2022

East Coast Slipway 1 East Coast Slipway 2
Coastal Protection

Guyana: Jan De Nul Island – Coastal Erosion Works

Construction of reinforced-concrete wall on the foreshore at the base of an eroded cliff face, topped with a gabion wall and backfilled to the cliff crest.

Contract Value: $1.5 m
Construction Period: 2022

Jan De Nul 1 Jan De Nul 2