Paraguay South America: Bi-Oceanic Corridor Road Realignment – Contract B

Realignment and reconstruction of 1.5 km urban road: 10.5 m carriageway, 2.0 m grass verges, 1.75 m cycleways, 1.8 m footpaths, plus full utilities diversion and new random-rubble boundary walls.

Project Team:
Client – Ministry of Public Works
County Council Engineer – Rodriguez
Contract Value: $17.5 Million
Construction Period: 20 October 2006 – 11 April 2008

Bi-Oceanic Corridor
Road Construction

Paraguay PYO1 Dual Carriageway Hwy

Main Contract for the design and construction of a 2-lane motorway between Carmelo Peralta and Loma Plata: 20 km dual carriageway, 4 km local roads, 12 km access tracks, 13 principal structures (2 rail bridges, grade-separated junctions). Delivered as a joint venture.

Project Team:
Client – Ministry of Public Works
Engineer – Jacub Engineering Ltd.
Contract Value: €95 Million
Construction Period: September 2007 – June 2009

PYO1 Dual Carriageway
Highway Construction

Paraguay: Asunción Dual Carriageway

Main Contract for the design and construction of a 22.3 km, 2-lane motorway bypassing the towns of Asunción to Encarnación Road. Principal elements include grade-separated interchanges, 6 km of side roads, 10 km of accommodation access tracks, 31 principal structures, 2.3 million m³ of earthworks and 107,283 m of drainage. Delivered via joint venture.

Contract Value: $81 Million
Construction Period: Nov 2008 – Oct 2010